2010年12月31日星期五

Jinsha River ring dam xiluodu hydropower station tunnel (local channel) engineering construction tender notice _ bidding _ Sina Blog

Jinsha River ring dam xiluodu hydropower station tunnel (local channel) engineering construction tender bids code: TGT-XLD/TJ201004D1. tender conditions JinShaJiang xiluodu hydropower station is the jinsha River reach in the planning and development of the third block of cascade, which works mainly in power generation, and flood control, sediment and improve downstream navigation conditions, comprehensive benefits, has been ratified. The project now has the tender conditions, entrusted are now on the project for public tender, the invitation to qualified bidders in accordance with the provisions of the tender documents for sealed bid to this project. 2. project profile xiluodu hydropower station is located in the province of Sichuan, and Yunnan province leibo County, yongshan, County on the territory of the jinsha river flow, the station hub is located in the province of Sichuan and Yunnan Rayleigh wave County, yongshan, County of jinsha River Gorge from xiluodu, yongshan, county town of County from leibo 8km 15km from downstream channel mileage 184km Yibin city, power station, direction midsize cities Yibin, Xichang, zhaotong, Leshan-station hub are highway, highway transport private power plant to Kunming railway station, pu'erdu and pu'erdu town water hemp high speed connection (G85); at the power station on the East, South, North-West of have the Chengdu-Chongqing railway, Kunming-Kunming railway railway, from power station engineering area perimeter. Xiluodu hydropower station ring dam tunnel (local channel) works in 3 # tunnel in front of that section, the route right across the partial bifurcation, yangjia 3 # tunnel into the cave entrance, located on the left side of the tunnel bypassing power station hub architecture, K5 + 597.89 and 3 # tunnel access (= 3 # tunnel K5 + 370.77), route length 2602.38m, which tunnel 1 block, long 2494.89m. Xiluodu hydropower station ring dam tunnel (local channel) project main technical index: Highway rating: third-grade Highway standards; design speed: 30km/h; lane: 2 bed width: 8.5m pavement width: 7.5m circle csan francisco personal injury attorneys urve minimum radius General value: 65m tunnel section maximum elevation: 3% tunnel design structure gauge: 9.0 �� 4.5 design flood frequency: m 1/25 ground motion peak acceleration factor: 0.18. Remaining technical requirements by reference to the State and the Ministry of the existing relevant standards and specifications. The project duration is 18 months, the program started for 2011, March 1, project completion time for the 2012 August 31. 2011 Oct 30 days before the completion of this project tunnel pile, K4 + 700 ~ K5 + 500 tunnel excavation blasting. 3. tender range this project by the power station site traffic engineering 3 # road K2 + 995.51, cross-yangjia, 3 # highway tunnel into the right side of the entrance into the cave, and 3 # highway tunnel K5 + 370.77 access, the length of civil engineering, tunnel length 2.60238km 2494.89m, electrical and upstream to 3 # highway tunnel exit, length 3.55723km. (1) the project of foundation engineering, road construction, tunnel construction, facilities and embedded along the pipeline engineering and environmental protection project, all contracted construction, completion of maintenance and repair of defects; (2) the provision of engineering materials, labor, construction equipment; (3) in order to complete the construction project of all temporary engineering design, construction, operation, maintenance, removal, withdrawal, etc, including construction of roads, construction of the wind, water, electricity, communications, lighting, gravel, concrete production, warehouse and heap material field, temporary housing construction and public utilities, etc. (4) in order to complete the construction project of all relevant parties in coordination, etc. 4. the bidder qualification requirements (1) have independent legal personality; (2) passed GB/T 19001-2008 idt ISO 9001: 2008 quality management system requirements of standards certification and GB/T28001-2001 occupational health and safety management system standard "standards certification and GB/T 24001-2004 idt ISO14001: 2004 environmental management system requirements and user guide standard certification; (3) has a hydraulic engineering construction contracting next-level and higher qualification or highway engineering construction contracting next-level and higher qualification of construction enterprises, and highway tunnel project construction performance; (4) has made the construction of provincial or more administrative authorities issued safety in production permit; (5) of the proposed project manager sbill consolidation loan mortgage second hould have level qualification certified architect (hydraulic or highway) and a similar project manager and above 5 years (60 months) of the above experiences; (6) in the last three years down the bid, no serious breach of contract, no significant engineering quality problems, no bidding bribery record; (7) a healthy financial position. This tender is not accepted in the Commonwealth. The relationship with the investment shares of affiliated companies, or with direct management and managed relationships and subsidiary companies, or the legal representative for the same person two and two or more legal persons shall not bid, or else by feibiao processing. (Decree 27) 5. tender document gets invited to 2010-12/28 (statutory holidays and statutory holidays), 9 am to 5: 00 p.m. to 11: 00, 15: 00 to 17: 30 pm (Beijing time), with unit of introduction to purchase tender documents. The tender documents (with drawings) each priced at 2000 Yuan, to the same price more acquisitions, sales are not refundable. 6 survey site-time: 2010-12/3injury lawyers orlando0/ when 10 bid documents (including bid bond) submission deadline (tender deadline, the same below) as of 2011, Jan 18, 10: 00 o'clock, the bidder shall be 10: 00 o'clock will be submitted to the tender documents will not be accepted. Note: not to tender to purchase tender documents and registration of bidders are not eligible to participate in the tender. Contact: Wah days (Director): 13371753655 mobile Tel: 010 biography-68186265True: 010-80106176 E-mail: enrollment mode zbcg2011@126.com: sign up for the first point of contact with the above, get the application forms.

没有评论:

发表评论